Coleraine Hospital, Coleraine
Health & Aged Care
Built in 2013 this hospital provides the local community with residential aged care, allied health, home and community care services and community health services.
GTEK™ was used extensively throughout this project with each product selected needing to meet practical and specification requirements
(NB: at the time the Coleraine Hospital was built GTEK™ was known as BGC Plasterboard).
We used a wide range of 13 and 16mm GTEK™ Fire to achieve ratings, 6.5mm Curve in the nurses area, Impact in high traffic areas and Sound in between all the bedrooms.
Matt PatzelOther GTEK™ Case Studies
CALL 1300 652 242 FOR TECHNICAL SUPPORT